Structured cabling, server racks, CCTV and access control planned alongside your interior fit-out — so the network is finished, tested and live on handover day, not a punch-list item chasing the opening date.
Cabling, racks, cameras and access control planned together, not as separate trades tripping over each other.
Cat6/6A cabling run and certified to standard, labelled properly so the next person who opens a cabinet can actually understand it.
Comms rooms and server racks built to spec — power, cooling and cable management planned in, not squeezed in afterward.
Camera coverage and door access systems specified and installed alongside the rest of the fit-out, on the same schedule.
Fit-out IT that arrives on its own schedule is the thing that delays your opening date.
We work from your fit-out drawings, not a blank site, so cabling and containment are planned before walls close up.
A single IT scope — cabling, racks, CCTV, access control — quoted to sit inside your fit-out programme.
Our team works to the same site schedule as your contractor, not a separate visit after they've left.
Cabling certified, systems tested, and documentation handed over on the same day as the keys.
Especially useful when the opening date isn't moving.
Yes — most of this work is coordinated site-to-site with the main contractor's programme, not run as a separate project.
Yes, an initial scope and quote can come from drawings; final pricing is confirmed after a site visit once access allows.
We work to your contractor's schedule, not a fixed date of our own — the IT scope moves with the programme.
It can — many fit-out clients move straight into a Managed IT & AMC contract once the office is live.
Share your fit-out drawings and programme dates and we'll scope the IT side — no pressure, no script.