Home / Case studies / A JAFZA manufacturer opens a second office
Case study - Engineering manufacturer

A JAFZA manufacturer opens a second office

An engineering manufacturer in JAFZA is opening a second office at Expo City Dubai. We designed the two sites to work as one: a firewall at each site on a fixed address for an always-on link, and one phone system kept at head office so the published number never changes, with new-office extensions falling back to head-office phones if the link drops. The new office gets a server that extends the existing directory, rack-mounted storage for backups, Wi-Fi, a meeting-room video system and structured cabling to every desk. The customer released the order in September; installation follows the fit-out. Every device goes into the customer's register on their portal.

Get in touch

Tell us what you need

We reply within one working day.

PO Box 27558, Dubai, United Arab Emirates

We reply within one working day.